NSSDEO, Brgy. Burabud, Laoang, Northern Samar — The Department of Public Works and Highways – Northern Samar Second District Engineering Office (DPWH-NSSDEO) continues to demonstrate its commitment to ensuring public safety and maintaining road infrastructure.
In its latest efforts, the NSSDEO Maintenance Section Field Personnel successfully conducted a pothole patching operation on January 20, 2025, in Brgy. La Perla, Laoang, Northern Samar. This initiative was undertaken to address road conditions that posed risks to motorists and pedestrians alike. Concrete potholes can cause vehicular accidents and damage, were thoroughly filled to ensure smoother and safer travel for residents and commuters in the area.
Earlier, on January 17, 2025, the same team engaged in clearing operations and manual ditch cleaning in Brgy. Dale, San Roque, Northern Samar. The activity aimed to address issues of clogged drainage systems that had been causing water stagnation and increasing the risk of flooding, particularly during heavy rainfall. The clearing operation ensured proper water runoff and drainage flow, mitigating potential hazards to both residents and infrastructure in the area.
The DPWH Northern Samar Second District Engineering Office reiterates its commitment to addressing public concerns promptly, ensuring safer and better road conditions for the traveling public.(PR)